Auto Hobby Shop

Completed in 1996, this 9,400sf pre-engineered metal building includes 8 bays with 2 hydraulic lifts, an auto welding shop, engine rebuilding area, parts storage, office area, waiting room and locker rooms. This facility includes an infra-red heating system, auto exhaust evacuation system, waste oil recovery system and separate air and water for each bay.